AEC loads bagged rice at Kaohsiung

AEC’s period vessel MV Nord Taipei 33,142 dwat built 2011 loads just over 23,000 mt of bagged rice at Kaohsiung destined for West Africa.

Portions of the bags are hoisted up from barge alongside and into the vessel’s holds.

The Stevedores neatly stack and organize the cargo for optimal stability and stow.

AEC discharges soya bean meal at Buenaventura, Colombia

AEC’s time chartered vessel MV Orient Target 33,755 dwat built 2009 discharges cargo of soya bean meal at Buenaventura, Colombia.

Discharging by shore grabs to hoppers alongside into trucks waiting.

Also discharging by suction tower directly unto shore.